x
Breaking News
More () »

Work to replace I-90 Vantage Bridge deck ready to get underway

Drivers on I-90 will experience single-lane closures Monday through Friday beginning Monday, March 11, through the end of May.
Credit: Greg Blomberg - stock.adobe.com

SPOKANE, Wash. — Crews with the Washington State Department of Transportation (WSDOT) are now ready to replace the entire surface across the Vantage Bridge along I-90.

WSDOT and its contractor, Garco Construction, will be building an access under the bridge to prepare for the replacement of the current bridge deck. Crews will reportedly replace the bridge deck with pre-cast concrete panels.

Drivers on I-90 will experience single-lane closures Monday through Friday beginning Monday, March 11, through the end of May. Beginning in late May, traffic will be restricted to one lane in each direction seven days a week with the following exceptions:

  • Memorial Day weekend: All lanes open from 7 a.m. Friday, May 24, until 8 p.m. Tuesday, May 28.
  • Fourth of July week: All lanes open from 7 a.m. Monday, July 1, until 8 p.m. Monday, July 8.
  • Labor Day weekend: All lanes open from 7 a.m. Friday, Aug. 30, until 8 p.m. Monday Sept. 3.

WSDOT said drivers will experience long delays eastbound on Fridays and westbound on Sundays during the summer travel months. Traffic will be restored to two lanes in each direction for winter from November through April.

KREM ON SOCIAL MEDIA:Facebook | Twitter | Instagram | YouTube

DOWNLOAD THE KREM SMARTPHONE APP 
DOWNLOAD FOR IPHONE HERE | DOWNLOAD FOR ANDROID HERE

HOW TO ADD THE KREM+ APP TO YOUR STREAMING DEVICE 

ROKU: add the channel from the ROKU store or by searching for KREM in the Channel Store.

Fire TV: search for "KREM" to find the free app to add to your account. Another option for Fire TV is to have the app delivered directly to your Fire TV through Amazon.

To report a typo or grammatical error, please email webspokane@krem.com

Before You Leave, Check This Out