x
Breaking News
More () »

Highway construction and maintenance scheduled projects May 17-27

You might want to leave the house a little earlier this week.
Credit: KREM
highway construction copy.jpg

US 2-Division Street-Browne Street-Ruby Street/I-90 to Euclid Ave. (MP 286-289)

Highway: US 2 Region: Eastern County: Spokane Location: MP 286-289

Description: Asphalt grinding and re-paving. ADA sidewalk ramp improvements.

Website: www.wsdot.wa.gov/projects/us2/i90-euclid/home

Drivers should be alert for daytime lane restrictions for ADA work. During evening and overnight hours, drivers should expect multiple lane closures for paving and/or asphalt grinding.

US 2-West of Farwell Road/Costco Access Roundabout- (MP 295)

Highway: US 2 Region: Eastern County: Spokane Location: MP 295

Description: Construct a new 2 lane roundabout intersection between Winchester Road and Farwell Road for access to the new Costco development.

US 2 is reduced to one lane in each direction. Drivers should be alert for slow traffic, congestion, and delays, especially during commute hours, and may wish to seek alternate routes. Also, motorists need to be alert for trucks entering and exiting the roadway.

US 2/Deer Road to Colbert Road – Paving and turn lane improvements (MP 297-300)

Highway: US 2 Region: Eastern County: Spokane Location: MP 297-300

Description: Asphalt paving and turn lane improvements.

Website: www.wsdot.wa.gov/Projects/US2/deerrdtodaymtspokane

Drivers should be alert for possible lane restrictions during non-commute hours, Monday through Friday.

SR 21/Cannawai Creek to US 2 (MP 74.00 – 91.78)

Highway: SR 21 Region: Eastern County: Adams Location: MP 74.00 - 91.78

Description: Crack seal, pavement repair, prelevel in prep for upcoming chip seal.

Website: www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home

Drivers should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway.

SR 21/Lind to I-90 (MP 24.77 – 37.71)

Highway: SR 21 Region: Eastern County: Adams Location: MP 24.77 – 37.71

Description: Bridge deck HMA removal and repair, crack seal, pavement repair, prelevel.

Website: www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home

Drivers should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway.

SR 25/Vicinity of Two Rivers & Fort Spokane-Spokane River Bridge Embankment Repairs- (MP 23)

Highway: SR 25 Region: Eastern County: Stevens Location: MP 23

Description: Stabilize slopes adjacent to west end of bridge

Website: www.wsdot.wa.gov/projects/sr25/spokane-river-bridge/home

Motorists should be alert for temporary traffic signal controlling single-lane, alternating traffic across bridge with delays of about 3 to 4 minutes, 24/7.

SR 41/BNSF-POVRR Railroad Bridge (MP 38)

Highway: SR 41 Region: Eastern County: Pend Oreille Location: MP 38

Description: Replace the bridge over the railroad tracks just south of Newport, Washington, and Oldtown, Idaho. This bridge is jointly owned by the Idaho Transportation Department and WSDOT. This is an Idaho Transportation Department project.

Website: www.itd.idaho.gov/d1/

The bridge is reduced to one lane with temporary signalization. The nearby intersection of Fourth Street will be closed with a detour on Marion Street posted.

US 195/Colton to Pullman (MP 10-19)

Highway: US 195 Region: Eastern County: Whitman Location: MP 10-19

Description: Asphalt pavement patching

On Monday, Wednesday, and Thursday; May 21, 23, and 24, between 7 a.m. until as late as 5 p.m., drivers should expect flaggers and pilot cars directing single-lane, alternating traffic at work locations with delays up to 15 minutes.

US 195/Bridge Deck Repairs-Vicinity of Steptoe and Rosalia (MP 48, 63, 65)

Highway: US 195 Region: Eastern County: Whitman Location: MP 48, 63, 65

Description: Grind out concrete pavement, repair base as needed and resurface with concrete.

Website: https://wsdot.wa.gov/projects/us195/bridge-deck/home

Motorists should be alert for temporary traffic signals near Rosalia and near Steptoe) with delays at each location, adding up to 10 extra minutes for the trip.

US 195/Colfax to Spangle-Passing Lanes Phase 2 (MP 56, 68, 70 & 72)

Highway: US 195 Region: Eastern County: Spokane & Whitman Location: MP 56, 68, 70 & 72

Description: Add 4 new passing lane segments.

Website: www.wsdot.wa.gov/Projects/US195/colfaxtospanglepassinglanes/

Drivers should be alert for possible, short-term, shoulder or lane restrictions.

SR 261/Sutton to I-90 (MP 44.85 – 62.67)

Highway: SR 261 Region: Eastern County: Adams Location: MP 44.85 – 62.67

Description: Crack seal, pavement repair, prelevel. Pavement repair and prelevel paving.

Website: www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home

Drivers should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway.

SR 291/ Charles Road to Suncrest (MP 9-14)

Highway: SR 291 Region: Eastern County: Spokane & Stevens Location: MP 9-14

Description: Grind out old asphalt and resurface

Website: https://www.wsdot.wa.gov/projects/sr291/charles-road-suncrest/home

Beginning on Tuesday, May 22 from 7 p.m. until 6 a.m. during the week, drivers should expect delays with flaggers and/or pilot cars directing single-lane, alternating traffic at work locations.

SR 290-Trent Ave./Perry Street Roundabout- (MP 1)

Highway: SR 290 Region: Eastern County: Spokane Location: MP 1

Description: Construct single lane roundabout at the Trent Ave./Perry Street intersection to facilitate new Martin Luther King Way

Website: https://my.spokanecity.org/projects/riverside-drive-phase-2b/

SR 290/Trent Ave. is fully closed just east of Hamilton at Perry Street. Signed detours available.

NSC-US 395/Freya Structures (MP 162)

Highway: US 395 Region: Eastern County: Spokane Location: NSC MP 162

Description: Construct two mainline freeway bridges over Freya Street

Project Website: www.wsdot.wa.gov/Projects/US395/nspokanecorridorfreya/

Drivers should be alert for occasional traffic control at the Freya roundabouts.

Before You Leave, Check This Out